Closes F4 + F12: the sim NDO silently accepted two writes that real NDO 4.x
rejects server-side (the two documented walls behind the two-phase deploy):
- F4: binding a site-local service graph whose serviceNodes[].device.dn does
not exist on the target APIC -> now 400 "Service graph device <dev> does
not exist in tenant <t> in Fabric <site>" (cross-plane check against the
per-site APIC MITStore; single-process sandbox shares live store objects).
- F12: partial per-fabric serviceGraphRelationship redirect coverage -> now
400 "must have uniform redirect policy configured on all fabrics";
validated on POST-request state (deepcopy->apply->validate->commit) so a
single atomic all-fabric PATCH passes, matching real NDO. Coverage-based
per (template, contract) — sibling templates with same-named contracts
cannot cross-reject.
Non-service-graph PATCHes keep the in-place fast path. Fail-safe
default-allow; all-or-nothing on rejection. +33 tests (1131 passed).
Live gate: MS-TN2 two-phase chain 12/12 green (no false-reject); phase2-only
400s with golden message + zero residue; single-fabric PATCH 400s while the
atomic both-fabric control returns 200.
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_017zdUTqU9fvCCvF3uVGZsu1